Centeline Home 百特地产 CENTELINE GROUP
EN

Industrial property · Penang & Kedah

Industrial land for sale in Penang and Kedah

Industrial land in Batu Kawan, Seberang Perai and Kulim for factory development, from single plots to large parcels. We check title, zoning, access and the power and water capacity before you commit.

Send my requirement on WhatsAppCall +60 16-559 6624

Handled personally by Crystal Tee, REN 26151 · IQI Champion 2024 & 2025

Buyer's guide & calculators →Foreign investor Q&A →
Industrial land for sale in Penang and Kedah

Where to look

Batu Kawan

A newer mainland industrial park beside the Second Penang Bridge, planned for high-technology manufacturing.

Bukit Minyak & Simpang Ampat

Established mainland industrial areas with good highway access, popular for mid-size factories and suppliers.

Prai & Butterworth

Close to Penang Port and the North–South Expressway, a strong choice for logistics, warehousing and heavier industry.

Kulim Hi-Tech Park & Kulim

Kedah's high-tech park and surrounding estates, a short drive from Penang mainland, with larger land parcels.

What we check for you

  • Power supply in amps or kV, and upgrade options for your machines
  • Ceiling height, floor loading, loading bays and truck access
  • Land title, tenure, zoning and any consent fees
  • LMW, free zone or bonded status if you export

How it works

  1. 01Tell us your requirement
  2. 02Receive a shortlist
  3. 03Visit the sites
  4. 04Negotiate and sign

Common questions

What should I check before buying industrial land?

Title and tenure, the land use category and zoning, any approved development plan, road access, and the capacity of power and water supply.

Can I build my own factory on the land?

Yes, subject to planning permission and building plan approval from the local council, plus utility approvals. We can introduce consultants and contractors.

Can a foreign company buy industrial land in Malaysia?

Yes, through a Malaysian company and subject to state rules. A manufacturing company buying industrial land does not need Ministry of Economy approval. Our guide for foreign buyers explains the rules. →

Tell us what you need

Size, power, location, budget and timing. Crystal will reply personally with suitable options.

Send my requirement on WhatsAppCall +60 16-559 6624

More searches

Factory for rent in PenangFactory for sale in PenangWarehouse for rent in Penang and KulimFactory and warehouse in Kulim, KedahBuyer's guide & calculatorsForeign investor Q&A

Availability, prices and specifications change often and are confirmed on enquiry. General information only.

WhatsApp Crystal
Call the office